Water Main Break on East Main

Wednesday, November 01 2006 @ 03:56 PM EST

Contributed by: filkee

The Town's contractor will be onsite at first light tomorrow morning, which will allow us time to set up for the repair this afternoon.

A section of the edge of the road and the sidewalk will be barricaded off, and preparations made for the fix tomorrow.

Everyone on Rt. 2 from the intersection to the Victorian Inn will be without water after 6:30 am Thursday until the line is repaired, hopefully by noon.

0 comments



http://www.myrichmondvt.com/article.php/myrichmondvt_watermain_break